What Your Tech Pack Needs Before a Factory Will Quote

A factory can give a reliable price only when it knows the fabric, construction, trims, decoration, quantities, and delivery terms. Here is what to send at each stage, from the first quote to bulk production.

To give a price it will stand behind, a factory needs to know what the garment is made of, how it is constructed, what trims and decoration it has, how many pieces you want in which colors and sizes, and where and when the goods should be delivered. If any of these is missing, the factory either guesses, and the price changes once the details come out, or it doesn't reply at all. You don't need a finished tech pack to get a first quote. You need the parts that drive cost.

What is a tech pack?

A tech pack is the set of documents that tells a factory exactly how to make a garment. It removes guesswork, so the sample matches your design instead of the factory's assumptions. A full tech pack usually has these parts:

PartWhat it contains
Cover pageStyle name or number, season, date, version number, colorways
Technical flatsFront, back, and side line drawings, with callouts for seams, pockets, closures, and label positions
Bill of materials (BOM)Every fabric, trim, thread, label, and hang tag, with colors, supplier codes, and quantities
Points of measure (POM)Measurements for the base size, with an allowed tolerance for each
GradingHow each measurement changes from size to size
Construction detailsSeam types, stitch types, stitches per inch, thread colors, finishing
Cost sheetEstimated material and labor cost, and a target price
Revision historyWhat changed in each version, when, and who approved it

Keep a version number on every page. A factory working from an older version will build the older garment.

Which parts of a tech pack drive the price?

Price follows materials and labor. These items move a quote the most, so they're what a factory needs before it can price:

ItemWhy it changes the priceWhat to send for a quote
Main fabricUsually the largest material costFiber content, knit or woven type, weight in grams per square meter (GSM), and how it is colored: dyed fabric, garment-dyed, or printed
ConstructionEach operation adds sewing timeFront and back flats with seam and stitch callouts, especially special operations such as flatlock seams or bound edges
TrimsEach trim is a separate purchase, and custom trims have their own minimumsA list: zippers, drawcords, eyelets, buttons, elastic, with size and finish
DecorationPrinting and embroidery are often subcontracted and priced separatelyMethod, number of colors, size of each artwork, and its position
Labels and packagingCustom woven labels and hang tags add cost and lead timeWhich labels, where they go, and how each piece is folded and bagged
Size rangeLarger sizes use more fabricThe sizes you need

"Soft cotton" is not a fabric specification. Two hoodies that look the same in a photo can differ a lot in cost if one uses a much heavier fleece than the other.

What does a factory need besides the tech pack?

The tech pack describes one garment. The quote also depends on the order around it.

  • Quantity, split by color and size. "500 pieces" is not enough. A factory prices 500 pieces in one color differently from 500 spread over four colors, because each color may need its own fabric run. See how clothing MOQs work for why the split matters so much on small orders.
  • Delivery destination and terms. Say where the goods are going and which delivery term you want quoted. The Incoterms rules, published by the International Chamber of Commerce (the current version is Incoterms 2020), define which party pays which costs and carries which risks. An FOB price covers the seller's costs until the goods are loaded on board the ship at the named export port; freight, insurance, and import duties are yours. FOB is meant for sea freight. For air freight, or containers handed to a carrier before the port, the matching term is FCA. A DDP price covers delivery to the named destination, such as your warehouse, including import duties. Ask for the same term from every supplier, or you can't compare their prices (how to compare quotes on different delivery terms).
  • Target delivery date. Factories plan around their line schedule. A date tells them whether they can take the order at all.
  • Sample needs. How many samples, in which sizes, and whether you'll pay for them.
  • Target price (optional). Sharing one is a choice. It helps a factory suggest cheaper fabric or construction alternatives when your design is over budget.

What do you need at each stage: quote, sample, and production?

Each stage needs more detail than the one before it. Sending the right set for the stage saves rounds of back and forth.

StageWhat to have ready
First quoteFront and back flats, main fabric specification, trims list, decoration details, quantity by color and size, destination and delivery term
First sampleEverything above, plus base-size measurements with tolerances, construction callouts, and label positions
Bulk productionEverything above, plus graded measurements for every size, written comments on the approved sample, the final bill of materials with supplier codes, and packing instructions

A quote based on the first-stage set is an estimate. Expect it to move when the sample-stage details arrive, especially if construction changes. Ask the factory which assumptions its quote rests on, so you can see what might change.

Example: what a quote request for a pullover hoodie contains

Here is an example of a complete first-quote request. The numbers are only for illustration, not recommendations.

  • Style: Pullover hoodie, unisex fit, version 1
  • Fabric: 100% cotton brushed-back fleece, 400 GSM, dyed fabric, color matched to a Pantone reference
  • Construction: Two-piece hood with self-fabric lining, kangaroo pocket, set-in sleeves, rib-knit cuffs and hem
  • Trims: Flat cotton drawcord with metal tips, two metal eyelets
  • Decoration: One-color screen print on the chest, 25 cm wide
  • Labels and packaging: Woven neck label, printed care label in the side seam, each piece folded into its own polybag
  • Quantity: 200 pieces in one color: S 30, M 60, L 60, XL 35, XXL 15
  • Delivery: Los Angeles, quoted both FOB and DDP
  • Target ship date: A specific date
  • Attachments: Front and back flats, a reference photo for the fit

A factory can price this without guessing. Change one line, such as "fleece" with no weight given, and the quote becomes a guess.

What gaps most often stall a quote?

  • A photo with no specification. "Make it like this" leaves fabric, weight, and construction to the factory's guess.
  • Naming another brand's product as the spec. The factory doesn't know that garment's fabric or construction any better than you do.
  • No quantity split. Without colors and sizes, the factory can't calculate fabric.
  • No destination or delivery term. The price could mean the factory's door or yours.
  • Mixed units. Inches in one place and centimeters in another lead to errors. Pick one unit and label it.
  • Several versions in circulation. If the factory has two files, it may price the wrong one.

Why do quotes change after the first sample?

A quote often changes after the first sample because something that drives cost was settled only during sampling. Common causes:

  • The fabric changed. The first quote assumed one fabric weight, and the brand chose a heavier one after feeling the sample.
  • The decoration grew. A small chest print became a large back print, or a one-color print became three colors.
  • Trims became custom. A standard drawcord became a dyed-to-match one, or a printed label became a woven one, each with its own minimum.
  • The quantity split changed. The order moved from one color to several, so each color now has fewer pieces.

Each of these is a reasonable design decision. Writing them into the quote request from the start, even as "to be confirmed," lets the factory price the likely version instead of the cheapest one.

Sources