A first clothing order passes through seven stages: tech pack, sourcing and quoting, sampling, fabric and trims, bulk production, shipping, and customs and delivery. How long it takes depends less on sewing time than on how many sample rounds you need, whether your fabric is in stock or made to order, and how the goods are shipped. Most delays happen between stages, while someone waits for a decision, a sample, or fabric. For orders from China, Chinese New Year on February 6, 2027 also shuts down production for several weeks.
What are the stages, and what does each depend on?
| Stage | What happens | What sets the time |
|---|---|---|
| Tech pack | Design turned into specifications | How complete your design is |
| Sourcing and quoting | Find factories, send requests, compare quotes | How quickly factories reply, and how complete your request is |
| Sampling | Proto, fit, and pre-production samples | Number of rounds, plus courier time for each round |
| Fabric and trims | Order fabric, approve lab dips, buy trims | Stock fabric or made to order, custom colors, custom trims |
| Bulk production | Cutting, sewing, finishing, packing | Order size, factory schedule, decoration done elsewhere |
| Shipping | Ocean, air, or courier to the US | Shipping mode and route |
| Customs and delivery | Entry, duties, delivery to you | Paperwork accuracy, broker, inland transport |
Ask each supplier for its own estimate of each stage. Published averages are a poor guide for a specific garment and factory.
Which stages can run at the same time?
Running stages in parallel is the main way to shorten the total time:
- Order fabric during the fit round. Once the fabric is approved, made-to-order fabric can be produced while you finish the fit. Wait until after the PP sample and fabric becomes the longest wait.
- Prepare labels and trims early. Woven labels and custom trims have their own production time. Approve them before the PP sample, so they're ready for it.
- Book shipping before production ends. Ask your forwarder for options while the goods are still being sewn.
The risk is spending on fabric or trims before the design is final. Order early only what you're confident won't change.
Where does production usually stall?
Delays tend to come from the same places:
- Incomplete requests. A factory that has to ask questions before quoting adds days to every exchange.
- Extra sample rounds. Each round adds sewing time plus a courier trip each way. Design changes after the first sample are the most common reason for extra rounds.
- Slow approvals. A sample waiting on your desk for a week is a week added to delivery. Set a turnaround time for yourself and keep it.
- Custom fabric colors. Lab dips can take more than one attempt to match, and the mill only starts dyeing once a color is approved.
- Decoration done outside the factory. Printing or embroidery at a separate shop adds transport and scheduling between the two.
- Holidays. Factory holidays stop production and slow it before and after.
- Customs problems. A wrong tariff code, a missing document, or a value that doesn't match the invoice can hold goods at the port.
How does Chinese New Year affect a production plan?
Chinese New Year falls on February 6, 2027. Many Chinese factories close well beyond the official public holiday. Workers travel home before it and return gradually afterward, and some don't return at all. One sourcing firm describes a practical slowdown of about four to six weeks, from late January to late February or early March, with output recovering over several weeks after the holiday.
Factories in other countries can also slow during the Lunar New Year, notably in Vietnam, where it is also a major holiday.
For planning:
- Finish sampling before the holiday. A sample that isn't approved before the shutdown usually waits until production is back to normal.
- Ask whether bulk will finish before the shutdown. If not, ask how much will ship before and how much after.
- Expect quality risk after the holiday. New or returning workers on a restarted line make more mistakes in the first weeks. Inspect the first goods after the restart closely.
For a spring launch, these decisions usually need to be made in November or December of the year before.
How does the shipping mode change the timeline?
Ocean freight is cheapest but slowest, with additional time at the port for unloading and customs. Air freight is faster but costs much more per kilogram. Express couriers are the fastest door to door and the simplest for small shipments, but usually the most expensive per piece.
Since August 29, 2025, low-value shipments into the United States no longer enter duty-free, so even a courier shipment of samples or a small order needs a customs entry. Ask your forwarder or courier for the full transit time door to door, including customs, not only the time in transit. See how to estimate landed cost for what the entry adds to cost.
How do you build a realistic schedule?
Work backward from the date you need the goods:
- Start with your launch or sales date.
- Subtract the time for receiving, checking, and preparing the goods for sale.
- Subtract shipping, customs, and delivery time from your forwarder.
- Subtract the factory's bulk production time, from PP approval to ready to ship.
- Subtract the time for fabric and trims, if they can't overlap with sampling.
- Subtract the sampling rounds you expect, plus one extra round.
- Check the calendar for factory holidays in that window.
If the start date that comes out is already past, decide early what to change: fewer styles, stock fabric, faster shipping, or a later launch.